
In April 2024, Yunda signed a cooperation agreement for the EPS (Engineering, Procurement, and Service) of the 300 TPD duplex board project with PHP in Bangladesh. The supply scope mainly includes:
◆Complete stock preparation lines — conveying system, D type continuous pulping system, HC cleaner system, coarse screen system, fractionating screen system, fine screen system, refining system, and agitators, etc.
◆ Approach flow system
◆ DCS (Distributed Control System) and MCC (Motor Control Center)
◆ Detailed engineering
Currently, all equipment is being shipped in a tight and orderly manner. The successful signing of this project marks an important milestone for Yunda after more than 20 years of deep cultivation in the South Asian market.
Case
-
Yunda’s Complete Stock Preparation System for Jinlong’s 6600 mm Packaging Paper Project Enters Commissioning Stage
-
Yunda Secures Orders for Premium Tissue Paper Projects at Two Yusen Group Production Bases
-
Yunda Successfully Ships the Complete Stock Preparation System for Hengan Group’s Tissue Paper Project
-
Yunda’s Complete Stock Preparation Systems for Guangxi Xiongfu Paper’s 300,000 t/a Grayboard Paper Project Successfully Start Up
-
Yunda Wins the Full-Line Pulping Equipment Order for Qian’an Boda’s 150,000-Ton Bleached Chemi-Thermomechanical Pulp (BCTMP) Project
-
A Great Start! Yunda’s Complete Stock Preparation System Supports Successful First Paper Production on Jiangxi Zhenguan PM5
-
Yunda Successfully Starts Up Complete Stock Preparation and Approach Flow Systems for Jiangmen Renke Oasis 80,000 TPA Tissue Paper Project
-
Successful Start-Up of Taisheng Group’s Tissue Paper Project in Guizhou
-
Taisheng Group’s Tissue Paper Project in Jiangxi Successfully Starts Production
-
Sun Paper 300,000 TPA Tissue Project (Phase II) – Complete Pulping System Successfully Started Up
